ISO 9001 Certified EN 13501-1 A1 Non-Combustible ASTM C533 Compliant 14 Patents
All FAQ

How to Import Calcium Silicate Insulation from China?

Importing calcium silicate insulation from Mingfa follows a straightforward process. We have exported over 360,000 m³ to 70+ countries and handle all export documentation. Here is what to expect at each stage.

Step 1: Send Your Inquiry

Contact our sales team by email (lzmfgr@163.com) or through our contact form. Provide your product specifications: type, temperature grade, dimensions (length x width x thickness), density class, quantity, and destination port. The more detail you provide, the more accurate your quotation will be.

Step 2: Receive Quotation

We respond within one business day with a formal quotation including: unit price, total order value, incoterms (FOB Qingdao, CIF to your port, or EXW), estimated lead time, and container loading plan. Quotations are typically valid for 30 days.

Step 3: Confirm Order and Proforma Invoice

Once you accept the quotation, we issue a proforma invoice (PI) detailing the complete order specifications, pricing, payment terms, delivery schedule, and shipping arrangements. Review and confirm the PI. Standard payment terms are 30% deposit on order confirmation, 70% balance before shipment. Letters of credit (L/C) are accepted for established customers.

Step 4: Production

Production begins upon receipt of the deposit. Standard lead time is 15-30 days depending on order volume and product specifications. During production, we can provide progress updates and photos upon request. For large or critical orders, pre-shipment inspection can be arranged.

Step 5: Inspection

Before packing, every batch undergoes our standard quality testing (density, compressive strength, thermal conductivity, dimensional accuracy). Batch certificates of analysis are prepared. If you require third-party inspection (SGS, Bureau Veritas, TUV, or your nominated inspector), this can be arranged at your cost.

Step 6: Shipping and Documentation

Goods are packed on fumigated wooden pallets with waterproof PE film and loaded into containers at our factory. Containers are trucked to Qingdao port (approximately 2-3 hours from factory). We provide a complete documentation package:

  • Commercial invoice
  • Packing list with pallet details
  • Bill of lading (for sea freight) or airway bill (for air freight)
  • Certificate of origin (Form E, Form F, or general COO as required)
  • Batch certificates of analysis (density, compressive strength, thermal conductivity, shrinkage)
  • Asbestos-free declaration
  • Fumigation certificate for wooden packaging (ISPM 15 compliant)

Step 7: Payment and Release

For T/T terms, the balance payment is made before shipment release. Once payment is confirmed, shipping documents are released to you for customs clearance at the destination port. For a more detailed guide, see our blog post on importing insulation from China.